Skip to main content

AC Guideline & Checklist

AC Guideline & Checklist

In order to prevent a delay in the installation of your Air Conditioner (“AC”), below are the guidelines that you must follow:

Air Conditioner Unit Specifications

– BTU = up to 6000. One unit will handle up to 250 sq. ft.
– Max. Weight = 50 lbs.

Installation Checklist

(failure to abide by this checklist may result in AC not being installed)

Prior to Installation:

  • Tenants must register AC unit(s) by contacting the Maintenance Department at (508) 635-3200 or their management office; a separate notice regarding the installation date will be sent
  • The AC must meet the unit specifications listed above; otherwise, it will not be installed and the installation fee will not be refunded
  • Tenants must ensure the AC is accessible for proper installation by placing it at the window where it will be installed
  • The AC power cord must reach an electrical outlet; extension cords are not allowed
  • Tenants are responsible for moving any obstacles from the window area where the AC unit will be installed

Day of Installation:

  • If the checklist items above are not met on the day of installation, WHA reserves the right to cancel the installation
  • Inoperable or damaged AC units will not be installed and will be removed from the premises
  • Maintenance staff will place a sticker on every authorized AC prior to installation
  • Unauthorized ACs will be inspected by WHA staff and reported to management for follow-up and billing