Lincoln Park Tower Riser Project

Updates

Week of February 22 – February 27

  • Phase 1 construction fully underway
  • Active construction begins daily at 7 a.m., Monday-Friday
  • Most plumbing fixtures removed from north wing units
  • “Zip walls” protect residents’ belonging from dust
  • “Ram boards” applied to common area flooring of construction wing as well as in-unit floors to protect existing floor finishes.
  • “Batten Matts” applied to elevator walls for protection of finishes.
  • “Warning” signs in place at corridor entering construction zone
News Image 1
News Image 1
News Image 1
News Image 1

Project Summary

The Lincoln Park Tower Riser Project is a major building-wide upgrade focused on replacing the aging plumbing system to ensure long-term reliability and improved service for residents. The work includes new hot and cold water supply lines, waste piping, shower valves, and updated in-unit fixtures such as tub/shower units, bathroom sinks, medicine cabinets, and kitchen faucets. Construction will be completed in three phases to minimize disruption: Phase 1 covers the north and south low-rise wings, Phase 2 covers the main tower (each with sub-phases), and Phase 3 addresses the machanical room and common areas. This comprehensive approach addresses onging plumbing issues, reduces maintenance needs, and modernizes apartment bathrooms and kitchens as part of a durable, long-term solution.

Why Replace the Water Riser System?

Due to age, current condition of the water risers, and the volume of work orders associated with the plumbing system, it was determined that a complete overhaul of the water riser system would be an appropriate action for a long-term solution. Because the riser replacement work involves removing of the existing fixtures and appliances, it was further determined that the new fixures and new shower surrounds would be replaced at the same time.

What to Know

  • LPT was built in 1968 and contains 199 units.
  • Work is being done in three phases:
    Phase 1: North and south low-rise wings (phases 1A and 1B)
    Phase 2: Main tower
    Phase 3: Mechanical room and common area work
  • The project scopes involve replacing:
    • Hot & cold water supply lines
    • waste lines
    • Shower valves
    • Bathroom tub/shower
    • Bathroom sink
    • Bathroom medicine cabinets
    • Kitchen faucets
  • Residents will be relocated as part of a coordinated relocation plan during each phase.
  • Informational resident meetings have been held on a regular basis since late 2025.

This packet includes a comprehensive checklist intended to help LPT residents prepare for relocation.

For LPT residents who will temporarily reside in a pre-arranged hotel, this document describes your hotel room, food and meals, housekeeping, on-site amenities and services and other important information.

FLOOR PLANS

  • Ground Floor Plans
  • First Floor Plans
  • Second Floor Plans
  • Third Floor Plans

COMING UP

A schedule of work to be done

PHOTOS

WHA will maintain a photo library chronicling this project from resident meeting up to and including project completion

LPT Riser Project Meetings

Resident Outreach Photos

LPT Move-out Staff Training

LPT Move-Out Day

Latest News

Lincoln Park Tower Riser Project
February 24, 2026

Lincoln Park Tower Riser Project

Read more
Phase 2 Demolition at Lakeside Apartments will yield new affordable home ownership units.
January 16, 2026

Phase 2 Demolition at Lakeside Apartments will yield new affordable home ownership units.

Read more
Project to build 360 housing units in Worcester gets $2M boost from state
December 9, 2025

Project to build 360 housing units in Worcester gets $2M boost from state

Read more